Regional Transit Authorities in Wisconsin: Original enabling legislation

Here’s the original enabling legislation for Regional Transit Authorites in Wisconsin, in a PDF format to peruse>

769_transportation_regional_transit_authorities_other_areas

This is the enabling legislation that was quickly disenabled by the reactionary Governor and Wisconsin Legislature sworn-in January, 2011.  We believe that this Governor and Legislature were elected with the help of–and completely beholden to–corporate syndicates in Wisconsin which benefit from stamping out mass transit. These syndicates include all those with the mission of prolonging the lifespan of the personal automobile, the asphalt highway building projects, the far-flung suburbs far from people’s jobs, and of course, the suburban house-building industries.

Several features jump out at you immediately when you read the document. First off, is its extremely limited scope:

8.Under the Governor’s budget recommendations, three regional transit authorities in the state could have sales tax authority and spending authority relative to transit service: a Dane County RTA, a Fox Cities RTA, and a Southeast RTA. No other areas of the state would be  allowed to create a regional transit authority. Some have contended that the Governor’s recommendations relative to RTAs are limited to too few areas of the state.

Here are the regions we would propose, instead, when the RTAs are re-enabled by the Legislature and a Governor with some planning and administration skills (which are utterly lacking in the present Governor’s office):
–Greater Milwaukee (Milwaukee, Kenosha-Racine, Waukesha Counties
–Fox Cities (Neenah-Menasha-Appleton-future connect Green Bay)
–Rock-Dane-Iowa-Jefferson Co.
–Central WI (Portage-Marathon-Wood-Lincoln (Merrill)-Waupaca Co. (future Madison link along Hwy 39-51 corridor)
–Eau Claire-Jackson-Chippewa Cos.
–La Crosse area (Great River)
–Superior to Hurley (incl Ashland-Bayfield) – expansion of current BART network.

IndiaSolarTrain
(Please note: Riders on Wisconsin renewably-powered mass transit systems would NOT be expected to hang outside the doorways on these trains. We also want you to arrive safely!)

Items 14 and 15 in the original proposal are reasonable responses to the problem of having regions which are actually too large to qualify for federal funding.  The matter of funding of these systems is going to be a chronic problem going forward.

Items 17 through 20 are very reasonable responses to problems we encounter in regions such as Central Wisconsin, with aging populations of rural and small cities, towns and villages lacking mobility that is required to live a “first-world” way of life in these times.  Any future enabling legislation must take into account these demographics of low-income plus increased numbers of aging people.

Items 22 through 24 have to do with giving taxing authority to the RTAs.  The suggestion to put these RTAs up to referendum vote rather than merely imposing them is reasonable, except in so far as —

–No corporate syndicate funding may be deployed in these referendums.  In other words, no Road Builder Associations.  No Petroleum Industry Syndicates.  No Real Estate Scams/Speculators/Brokerage Syndicates.  No Gasoline-Station Syndicates.  No Auto Dealer Syndicates.  And so on.

Items 28-31 dealing with “Imposition of the Sales Tax” need to be reviewed.  We would urge that creative new modes of taxation which place the heaviest burden squarely upon the corporations which benefit the most from good transportation systems in Wisconsin, shall be compelled to pay-in some form of taxation to make these systems viable.  In addition, income taxes need to be “re-progressivized” so as to place a much higher burden on folks earning over $150,000 per annum.  You know, like in the “old days.”  Only, these are the new days.

Under Attachment 1, “RTA Powers” section, these items need closer scrutiny in future enabling legislation

b. Contract for the private operation or supervision of the RTA’s transit system.

c. Contract with a public or private organization to provide transit services instead of

directly providing these services.

d. Lease facilities to public or private transit companies that operate within and outside the jurisdictional area.

–Since we are generally in opposition to “privatization” of public services, perhaps we could agree to expand the notion of “private operation” to include a) publicly-accountable not-for-profit organizations and/or worker-owned co-operative enterprises, in which a workers’ council of some form provides governance and oversight. This would be distinctly different from shareholder-owned, LLC, or sole-proprietary type of “private operators.”

Alt-EnergyBus
Image Source (click for link)

Your input on these ongoing narrative construction is welcome!
Wisconsin Green Party.

By regular mail, send your ideas to P.O. Box 387, Stevens Point WI 54481.
By email,
Submissions to:
greenpeoplesmedia@gmail.com

 

 

 

 

 

 

 

 

 

Crowd-fund! Send Johnny Dangers to the Sacred Stones Camp against Dakota Access Pipeline

The Central Wisconsin Green Party chapter endorses the non-violent direct action initiated by the Standing Rock Sioux Nation at Cannonball, North Dakota in effort to block the Dakota Access Pipeline which would carry the volatine, explosive, low-quality crude oil from the fracked oil field in the Bakken region of North Dakota. The pipeline would cross the sovereign territory of the Standing Rock Sioux, and cross North Dakota, South Dakota, Iowa and parts of Illinois using the unconstitutional “corporate eminent domain” process to seize farmlands and other personal landholders’ lands in order to profit the oil and gas interests who have heavily invested in the Bakken. It is a lose-lose for the people.

Long-time friend and collaborator of the Green chapter, nom de plume Johnny Dangers, will travel to the camp to help tell this critical story of our times, stand in solidarity, possibly face arrest. It is a story of Breaking Free of Fossil Fuels, and of native people’s assertion of centuries-old treaty rights with the Federal Government. We cannot permit the U.S. oil and gas industries to continue trampling on the rights of native people and non-Indian people in the Great Plains, simply to try and bail themselves out of insurmountable debt-loads to the finance capitalists, debts which will never be paid off, with or without a pipeline.

JohnnyDangersPic-Whiting

“Why do I feel called to stand up to the Dakota Access Pipeline?
They can’t fight back but I can! We can.

What do we say to them if we don’t?”  –Johnny Dangers

The PayPal button references our Central Wisconsin Greens member’s non-partisan County Board campaign fund, which is offered free of fees by a local community-minded bank, and all funds will be accounted for and disbursed according to the mission above. Wisconsin local elections are non-partisan, so this is not a Green Party-specific account.


Central WI Intercity Bus Feasibility Study 2010: tossed in the GOP fire in 2011

In 2010, a number of cities in Portage, Marathon, and Lincoln Counties, Wisconsin sent their leaders to a series of meetings to do a study on an intercity bus system. This 42-page, clearly-written and easy-to-read document is the result of those meetings between Merrill, Marathon City, Wausau, Mosinee, Marshfield, Stevens Point and Wisconsin Rapids.

In early 2011, the new One-Party regime which had swept to power in the November 2010 elections saw fit to disenable localities in Wisconsin from forming such multi-County Regional Transit Authorities as this study was done to create.

Publishing this study here is one of many steps in a process of building a Citizens’ Alliance for Regional Transit Authorities, to re-enable multi-County and multi-municipality Regional Transit Authorities, and to ultimately break up the One-Party corporate-run state headquartered in the Wisconsin Capitol Dome.

This, and many other citizens’ initiatives, will be the beginnings of a long push-back and break-up of One-Party rule in Wisconsin.  We have a democracy crisis in this state, and we’re going to overcome that and the people will prevail.

 

Central WI Intercity Bus Feasibility Study 2010

 

SolarBus